česky | english | по-русски homepage | login | sitemap | search
ABOUT THE COMPANY|COMPANY STRUCTURE|COMMUNICATION|PRODUCTION PROGRAMME|CONTACT
------------------------------------------------------------------------

Projection, construction and
delivering engineering organisation

Press releases

Changes in the Board of Directors 2012

In April of 2012, the company PRODECO, as changes in the composition of the Board of Directors and management.

+ whole article

Changes in the Company Board

In the first half of 2011, changes in the company Board and Management composition occurred.

+ whole article

They wrote about us

Klaus's Giant Excavator Ride

After almost 25 long years, a new giant wheel excavator came into being in the Czech Republic for exploiting coal in Northern...

+ whole article

New management and a record-breaking contract

Mr. Hynek Mühlbach as the Executive Director and the Chairman of the Board of Directors has been in charge of Prodeco Inc....

+ whole article


Restoration of D45 breaker

order no. 1700

Implementation: June - September 2009

Place: SD, a. s., Nástup Tušimice Mines

Investor: SD, a. s.

Subject of project:

The project applied to the reconstruction of the D45 coal breaker located at the third coal conduit from the mining location Libouš – Západ consisting of the parallel installation of two-shaft breaker MMD, 625 series to the existing breaker so that the total coal breaker output was 3000 t/hour.

In connection with that the existing steel structure was substantially modified and the new breaker was supplied as well as necessary parts of the breaker plant, new wiring including the integrated switch station, new central automatic lubricating system, compressor station with air manifold and air guns.
   