česky | english | по-русски homepage | login | sitemap | search
ABOUT THE COMPANY|COMPANY STRUCTURE|COMMUNICATION|PRODUCTION PROGRAMME|CONTACT
------------------------------------------------------------------------

Projection, construction and
delivering engineering organisation

Press releases

Changes in the Board of Directors 2012

In April of 2012, the company PRODECO, as changes in the composition of the Board of Directors and management.

+ whole article

Changes in the Company Board

In the first half of 2011, changes in the company Board and Management composition occurred.

+ whole article

They wrote about us

Klaus's Giant Excavator Ride

After almost 25 long years, a new giant wheel excavator came into being in the Czech Republic for exploiting coal in Northern...

+ whole article

New management and a record-breaking contract

Mr. Hynek Mühlbach as the Executive Director and the Chairman of the Board of Directors has been in charge of Prodeco Inc....

+ whole article


Transfer of TC 2/2 to inner dump

The project ‚Transfer of TC 2/2 to inner dump‘ was implemented in 1999 at Sokolovská uhelná a.s. Within the project PRODECO a.s. as a general supplier provided a general overhaul of spreader ZP 6600.17, general overhaul of excavator KU 800.16 and transfer of conveyors at the technological unit TC 2/2 including their general overhaul. The technological part of the project included delivery of a tripper car, cable car and equipment for coal deflection. The construction part consisted in construction of service roads to conveyors, assembly areas for driving units, addition of switch house Lipnice and bridges over coal lines. An important part was an electric delivery comprising 6 and 22 kV lines, transformer station, switch house as well as radio communication between dispatchings and technology control.

Photos

   
Realization © 2006 AOW, s.r.o. Content © 2006 Prodeco, a.s., All Rights Reserved