česky | english | по-русски homepage | login | sitemap | search
ABOUT THE COMPANY|COMPANY STRUCTURE|COMMUNICATION|PRODUCTION PROGRAMME|CONTACT
------------------------------------------------------------------------

Projection, construction and
delivering engineering organisation

Press releases

Changes in the Board of Directors 2012

In April of 2012, the company PRODECO, as changes in the composition of the Board of Directors and management.

+ whole article

Changes in the Company Board

In the first half of 2011, changes in the company Board and Management composition occurred.

+ whole article

They wrote about us

Klaus's Giant Excavator Ride

After almost 25 long years, a new giant wheel excavator came into being in the Czech Republic for exploiting coal in Northern...

+ whole article

New management and a record-breaking contract

Mr. Hynek Mühlbach as the Executive Director and the Chairman of the Board of Directors has been in charge of Prodeco Inc....

+ whole article


Belt conveyor at power plant Mělník

A very successful design of a tube conveyor for transport and deposition of agglomerate at power plant Mělník was implemented between 1998 and 1999. The conveyor is lead through a rough terrain with superelevation cca 60m and length more than 2 000m and it is easily reversible. A partial general overhaul of selected parts was implemented in 2005 by our company.

Technical details

conveyer width1 000 mm
conveyer diameter500 mm
rake angle150
velocity2,1 ms-1
conveyance capacity730 m3h-1 (up to 1 050 m3h-1)